Quantcast
Channel: Sentinel-Tribune - Recent Articles
Viewing all articles
Browse latest Browse all 8589

Legals: 09-09-13

$
0
0
001 LEGAL

NOTICE On 9/3/13, Weston Village Council passed emergency Resolution #2013-3 to enter into a cooperative agreement with the Wood County Commissioners to submit an OPWC grant application for “2014 Wood County Collaborative Village and Township Roadway Improvements”. A full copy of this ordinance is available at the Village Hall and at www.westono hio.org. Sept. 9, 16, '13



INVITATION TO BID SEALED BIDS for the furnishing of the necessary materials and construction of the ROSSFORD GENERAL I/I REMOVAL NORTHWESTERN WATER AND SEWER DISTRICT will be received by the Northwestern Water and Sewer District, 12560 Middleton Pike, Bowling Green, Ohio 43402 until 10:00 a.m. (Local Time) Tuesday, September 24, 2013 and at that time and place will be publicly opened and read aloud. The scope of work consists of reworking 50 "hammer taps" and grout the interfaces in Jennings East sewers as well as CIPP line 1,200 lineal feet of 12" diameter sewer with reworking and grouting 64 protruding lateral services in the Colony Road sewer system. Approximately 1,160 vertical feet of manholes will require lining with cementitious product. The contract documents, including plans and specifications, are on file at the office of the Northwestern Water and Sewer District and the Engineer -- Poggemeyer Design Group, Inc. (PDG). A set may be obtained from Becker Impressions, 4646 Angola Road, Toledo, Ohio 43614, Telephone 419-385-5303, www.pdgplanroom.com. A non- refundable deposit in the amount of $50 will be required for each set of plans and specifications; check must be made payable to Becker Impressions. The Engineer for the Project is Poggemeyer Design Group, Inc., 1168 North Main Street, Bowling Green, Ohio 43402. All bids must be signed and submitted on the blanks which are bound in this booklet. Bids must state the unit prices in the blanks provided and be enclosed in a sealed envelope marked --- Rossford General I/I Removal --- and addressed to the Northwestern Water and Sewer District, 12560 Middleton Pike, Bowling Green, Ohio 43402. The bid guaranty may be of two forms: 1. A Bid Guaranty and Contract Bond using the form in the Contract Documents. (The amount of the bid does NOT have to appear on this form.) 2. A certified check, cashier's check or letter of credit in favor of the Northwestern Water and Sewer District in the amount of 10% of the bid. If the contract is awarded, a Contract Bond will be required, which is a 100% payment and performance bond. This procurement is subject to the EPA policy of encouraging the participation of small businesses in rural areas (SBRAs). After the award of the contract let by competitive bid and prior to the time the contract is entered into, bidders shall submit the affidavit required under the Ohio Revised Code, Section 5719.042 that the bidder was not charged with any delinquent personal property taxes in Wood County, Ohio. The successful bidder will be required to pay not less than the highest applicable minimum wage rates as established by the federal Davis-Bacon Wage Determinations issued by the U.S. Department of Labor. No bidder may withdraw his bid for a period of 60 days after the scheduled closing time for the receipt of bids. This project is being partially funded with Ohio EPA Water Pollution Control Loan Fund (WPCLF) funds. The estimated cost of construction is $450,000. By Order of Jerry Greiner President Sept. 9, 16, '13




Viewing all articles
Browse latest Browse all 8589

Trending Articles