![]() |
"The kitchen dates to the 1970s, the restrooms are not handicap accessible, the floor needs to be replaced. The building is a near 100-year-old remnant of the old fairgrounds," Dr. Michelle Grigore, director of parks and recreation told the park board Tuesday night.
The structure is one of the few remaining projects on a largely completed list of 2005-2015 Master Plan Tasks. Grigore said the building is a popular and affordable rental and serves as a "rainy day" backup for summer programs, but needs lots of attention. She noted the block building has cracking problems, leaks in the roof and support beams that are sagging.